We are experts in the field of ground and soil stabilisation to geotechnically improve weak areas to allow the ground to bear greater loads for construction.
This methodology of modification or stabilisation of the existing ground allows us to offer a cost effective alternative to removing the material off site and importing other fill materials and reduces the carbon footprint by eliminating the requirement for road lorries to move materials in and out of the site.
Improving the ground’s ability to bear weight and to increase its tensile strength are core elements of the work conducted by our ground stabilisation team.
Our service encompasses everything from advice and guidance to design and implementation of ground stabilisation. We offer both cement and lime stabilisation, depending on ground conditions and required CBR values.
Stabilisation can provide added benefits to improve the properties of existing ground conditions, which often avoids the need to remove old and import new materials onto site.
Explore numerous examples of our extensive ground stabilisation projects in our case studies section, often including examples of constructing below the water table.