New Amazon distribution centre

The development of a new Amazon distribution centre in Darlington involves sizable construction works and associated roadways plus the installation and diversion of services and drainage.

Sector:

Retail - SG/Kiernan Construction

Services:

This project consists of main drainage, building of the section 38 road and footpaths, and construction of the new S278 entrance.

Their challenge:

Strict traffic controlled areas posed a significant challenge in this project, and with extensive digging, curbing and adjustment to road layouts, the contractor was looking for an experienced construction partner.

Our solution:

This project is a package distribution facility for Amazon. Applebridge is working for Kiernan Construction who in turn is working for the main contractor, ISG. Scope of works included:
  • Installation of over 4500lm of mains drainage, ranging from 150mm to 1200mm
  • Digging 6000lm of services inclusive of hundreds of metres of road crossing
  • Circa 5000lm of kerbing ranging from pin kerbs to road kerbs to Trief Kerbs
  • Building the site entrance under strict traffic controlled areas inclusive of re-working the existing traffic controls, installing and diverting services, moving kerb lines and associated drainage and tarmacking to the adjusted road layout

The results:

This £2.73m project commenced in August 2018 and is ongoing.

Find Us

Hughes House
Cargo Fleet Road
Middlesbrough
TS3 6AG

Sat Nav TS3 6AF

Contact Us

01642 233400
info@applebridge.com

Office Opening Hours
Monday - Friday 08:00 - 17:30

Get in Touch

Our Family