Sector:
Housing - Bellway Homes
Services:
A wide range of Applebridge’s services and expertise were utilised, including the construction of 39 homes, all earthworks, roads and infrastructure.
Their challenge:
The site levels worked with the existing stockpiles of clay and topsoil therefore an extensive stabilisation operation took place to make sure all the material was suitable for re-use in lieu of this being removed, and other material being imported.
Our solution:
Applebridge were principal contractor for a period of 31 weeks whilst completing earthworks, grouting up to 30m to the full due to past mining operations and all infrastructure works. Scope of works included:
- Construction of 39 homes
- Construct full infrastructure works, i.e. drainage, attenuation system, roads and infrastructure
- All earthworks and remediation
- Stabilisation
- Piling
- Grouting
- Retaining walls
The results:
This £3.23m project started in August 2019 and is ongoing.